home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / pc / text / shuttle / crewsaf.txt < prev    next >
Text File  |  1993-02-04  |  25KB  |  520 lines

  1. "6_2_7_2.TXT" (3402 bytes) was created on 05-03-88
  2.  
  3. CREW ESCAPE SYSTEM
  4.  
  5.  
  6.      A telescoping pole has been chosen as the egress method for 
  7. the Space Shuttle's crew escape system, to be incorporated 
  8. into the orbiter Discovery prior to the STS-26 flight in August 1988.
  9.  
  10.      The selection of the telescoping pole, over an alternative 
  11. tractor rocket extraction system, was made at NASA Headquarters 
  12. by National Space Transportation System Director Arnold D. 
  13. Aldrich following a review of system design, test performance and 
  14. flight hardware status.
  15.  
  16.      "The NASA-contractor team has done a fantastic job in 
  17. providing both the tractor rocket and telescoping pole systems to 
  18. support the next Shuttle flight," Aldrich said.  "The telescoping 
  19. pole was selected as it has shown to be safer, simpler to 
  20. operate, lighter weight and easier to support than the tractor 
  21. rocket system, while meeting all escape system performance 
  22. requirements."
  23.  
  24.      Tests conducted in February and March 1988, using a fixed pole 
  25. extending through a hatch-like opening in a C-141 aircraft, 
  26. demonstrated that the pole would provide adequate orbiter 
  27. clearance in an emergency egress situation.  
  28.  
  29.      Navy parachutists, approximating the sizes of astronauts 
  30. from the smallest to the largest, completed a total of 66 jumps 
  31. using a lanyard attached to their parachute harness to slide down 
  32. the pole and descend to a safe landing.  Analysis of aerodynamic 
  33. and photographic data showed that all the jumps provided the 
  34. necessary clearance margins.
  35.  
  36.      The telescoping pole, designed and manufactured at NASA's 
  37. Johnson Space Center, Houston, is made of light-weight aluminum 
  38. and steel and weighs 241 pounds.  It is about 70 pounds lighter 
  39. than the tractor rockets system.  The rockets also have a 5-year 
  40. operational shelf life limitation and additional processing 
  41. requirements between flights.
  42.  
  43.      The pole housing attaches to the orbiter's middeck ceiling 
  44. and is 126.75 inches long.  The primary extension is 112.54 
  45. inches (arched length), and the end extension is 32.65 inches.  
  46.  
  47.      For launch and landing, the unextended pole will be oriented 
  48. toward the closed crew hatch.   During on-orbit operations, the 
  49. pole will repositioned toward the middeck lockers and stowed on 
  50. the ceiling such that it will not interfere with the various 
  51. flight crew activities in the middeck area.
  52.  
  53.      This decision completes the crew escape system package.  
  54. Already approved and implemented are the orbiter primary crew 
  55. hatch jettison capability and crew support equipment -- a partial 
  56. pressure suit, oxygen equipment, a parachute, a life raft and 
  57. survival equipment for each crew member.
  58.  
  59.      The escape system provides crew escape capability from the 
  60. orbiter during controlled, gliding flight following failures or 
  61. difficulties during ascent or entry where landing at a suitable 
  62. landing field cannot be achieved.  Previous procedures for ascent 
  63. contingency aborts, where no landing site could be reached, 
  64. required orbiter ditching in the ocean, a condition which has 
  65. been shown by structural analysis to be extremely hazardous.  
  66.  
  67.      The side hatch jettison system also can be highly beneficial 
  68. for certain ground contingencies following non-normal landings.  
  69. A crew escape slide, similar to those provided on commercial 
  70. airliners, has been implemented in conjunction with the 
  71. jettisonable hatch to support rapid post-landing contingency 
  72. egress.
  73.  
  74.  
  75. CHANGES TO THE EMERGENCY EGRESS SYSTEM AT PAD 39-B
  76.  
  77. May 1988
  78.  
  79.      A number of modifications have been made to the emergency 
  80. egress system at Launch Pad 39-B to increase the margins of 
  81. personnel safety.
  82.  
  83.      Two baskets have been added to the 195-foot level of the 
  84. Launch Pad Fixed Service Structure.  Previously, there were five 
  85. baskets rated to hold four people weighing an average of 190 
  86. pounds.  Officials decided that the maximum individual weight 
  87. rating was not sufficient and increased it to 220 pounds per 
  88. person, which takes into account the weight of life-support 
  89. apparatus, such as air tanks, which escapees are likely to be 
  90. wearing.  Considering the bulk of the life-support apparatus, 
  91. officials also have decided that the baskets will be rated to 
  92. hold three people each instead of four, and will have a nominal 
  93. operating weight capacity of 660 pounds.  However, four people 
  94. will be permitted if necessary.  The maximum carrying capacity of 
  95. each basket is 880 pounds.
  96.  
  97.      The baskets were modified at KSC's Launch Equipment Shop.  A 
  98. side exit to the basket was incorporated, a flame-protective 
  99. covering was added over the existing webbed material and an
  100. anti-roll-back brake was added to ensure the basket comes to rest 
  101. as quickly as possible. 
  102.  
  103.      The braking mechanism for the baskets consists of a series 
  104. of increasing-density steel chains that drag through the sand in 
  105. the landing zone, decelerating the basket to a final stop.  The 
  106. new brake holds the baskets at their furthest extent of travel.  
  107. Before, the baskets would stop temporarily and then begin to move 
  108. backwards before coming to a complete stop.
  109.  
  110.      A rope arresting net at the end of the slidewire provides a 
  111. redundant stopping point for the basket in the unlikely event the 
  112. deceleration system fails.  At the stopping point, personnel exit 
  113. through the side opening.
  114.  
  115.      The basket will hang approximately 2-3 feet off the 
  116. ground.  The stainless steel sidewires will be restrained against 
  117. vertical movement to limit the variance in basket height as 
  118. occupants exit.
  119.  
  120.      Upon exiting, the crew members will make a decision as to 
  121. whether to enter armored personnel carriers and drive to safety, 
  122. or to enter an underground concrete bunker.  A new underground, 
  123. steel-reinforced concrete bunker was built and provides easier 
  124. access.  The bunker's roof is 1-foot thick and the walls are 15-
  125. inches thick.  It is 20-feet long by 13.4-feet wide, and is 
  126. located just to the south of the slidewire basket termination 
  127. area.
  128.  
  129.      The bunker contains emergency air for breathing, an 
  130. emergency shower, a telephone and four fold-down bunks.  It 
  131. features a five-foot-wide roll-up door in addition to a standard 
  132. swing door.  The roll-up door will be open during the final 
  133. launch countdown for easier access in the bunker.
  134.  
  135.      Fire-protection plating was added to the Orbiter Access Arm 
  136. and on the 195-foot level of the Fixed Service Structure (FSS).  
  137. Previously, there was an open-grate floor, as used on the rest of 
  138. the pad levels.  It is from this level that the crew enters and 
  139. exits the Space Shuttle. 
  140.  
  141.      Additional fire detectors have been installed on the FSS to 
  142. provide better coverage on the 195-foot level and the Orbiter.  
  143. The fire water spray system also has been upgraded for better 
  144. coverage on the egress paths.
  145.  
  146.      The lighting has been upgraded on the 195-foot level of the 
  147. FSS and at the slidewire landing area in the case of a night 
  148. emergency.  Emergency procedures and documents also have been 
  149. revised.
  150.  
  151. "6_2_7_4.TXT" (17028 bytes) was created on 11-28-88
  152.  
  153. SPACE SHUTTLE TRANSOCEANIC ABORT LANDING (TAL) SITES
  154.  
  155.    Planning for each Space Shuttle mission includes provi-
  156. sions for an unscheduled landing at contingency landing
  157. sites in the U.S. and overseas. Several unscheduled landing
  158. scenarios are possible, ranging from adverse weather condi-
  159. tions at the primary and secondary landing sites to mechani-
  160. cal problems during the ascent and mission phases that would
  161. require emergency return of the orbiter and its crew.
  162.  
  163.    The Transoceanic Abort Landing (TAL) is one mode of un-
  164. scheduled landing. The orbiter would have to make an un-
  165. scheduled landing if one or more of its three main engines
  166. failed during ascent into orbit, or if a failure of a major
  167. orbiter system, such as the cooling or cabin  pressurization
  168. systems, precluded satisfactory continuation of the mission.
  169.  
  170.    The abort mode would depend on when in the ascent phase
  171. an abort became necessary. The TAL abort mode was developed
  172. to improve the options available if failure occurred after
  173. the last opportunity  for a safe return to the launch site,
  174. but before the first opportunity to fly once around the
  175. Earth and return to a landing site. A TAL would be declared
  176. between roughly T+2:30 minutes and Main Engine Cutoff
  177. (MECO), about T+8 minutes, with the exact time depending on
  178. the payload and mission profile.
  179.  
  180.    A TAL would be made at one of four designated sites,  two
  181. in  Africa  and two in Spain: Ben Guerir Air Base,  Morocco;
  182. Yundum International Airport, Banjul, The Gambia;  Moron Air
  183. Base, Spain; and Zaragoza Air Base, Spain.
  184.  
  185.    Although  Banjul  has  many  of  the same features as the
  186. three other TAL sites,  it is formally called  an  augmented
  187. emergency landing site.
  188.  
  189.    Each  TAL  site  is  covered  by a separate international
  190. agreement,  but all four are  considered  augmented  because
  191. they have Shuttle-specific landing aids and NASA and Defense
  192. Department personnel available during a launch.
  193.  
  194.    Space  Shuttles  are  launched eastward over the Atlantic
  195. Ocean from KSC for insertion into equatorial  orbits.  In  a
  196. TAL  abort,  the orbiter continues on a ballistic trajectory
  197. across the Atlantic to land at a predetermined  runway.  The
  198. four  sites NASA has designated for TALs have been chosen in
  199. part because they are near the nominal ascent  ground  track
  200. of the orbiter,  which would allow the most efficient use of
  201. main engine propellant.
  202.  
  203.    Depending on mission requirements,  an orbiter follows an
  204. orbital  insertion  inclination between 28.5 and 57 degrees,
  205. with the lower inclination preferred in most  instances  be-
  206. cause it allows for a higher maximum payload weight. High or
  207. low inclination launches require different contingency land-
  208. ing site.
  209.  
  210.  
  211. BEN GUERIR AIR BASE, MOROCCO
  212.  
  213.    The primary TAL site for a low inclination launch is the
  214. Ben Guerir Air Base in Morocco. Ben Guerir has also been
  215. designated a weather alternate TAL site for high inclination
  216. launches because of its geographic location and its landing
  217. support facilities. Ben Guerir replaced a TAL site at Dakar,
  218. Senegal, which NASA concluded was unsatisfactory due to run-
  219. way deficiencies and geographic hazards.
  220.  
  221.    Morocco  is  located along the northwest coast of Africa,
  222. between 27 degrees and 37 degrees north. It is shielded from
  223. the desert of northern Africa by the Atlas mountains on  the
  224. eastern  border  of  the country.  A cool ocean current runs
  225. along the west coast,  similar to the situation in  southern
  226. California,  which  makes  the  coastal areas subject to low
  227. clouds and fog most of the year.  The interior  sections  of
  228. the country are generally arid,  with most precipitation oc-
  229. curring from October to April and concentrated in the north.
  230.  
  231.    Ben Guerir was designated as  a  TAL  site  in  September
  232. 1986.  Located on a flat, rocky, desert plain about 36 miles
  233. north of Marrakech,  Ben Guerir is a  former  Strategic  Air
  234. Command Base abandoned in 1963.  It has one runway, oriented
  235. in a north-south direction, which is 14,000 by 200 feet with
  236. a 720-foot overrun at the north end.  The runway surface has
  237. been  rejuvenated,  and  an  operations and storage building
  238. added.  NASA also  put  in  place  additional  fire-fighting
  239. equipment,  personnel  transport  vehicles  and other ground
  240. support equipment.  Communications include three  communica-
  241. tion satellite circuits.
  242.  
  243. YUNDUM AIRPORT, BANJUL, THE GAMBIA
  244.  
  245.    Yundum Airport has been named an alternate to Ben Guerir
  246. and Moron Air Base. Because of its in-plane location, Yundum
  247. could also be used for a late TAL and to accomplish a TAL in
  248. the event of in-flight failure of a second engine.
  249.  
  250.    Yundum was named a TAL site in September 1987. Yundum is
  251. The Gambia's international airport, located adjacent to the
  252. country's capital, Banjul. The airport is located on a flat
  253. plain seven miles inland from the Atlantic and six miles
  254. south of the Gambia River. The Gambia has a dry season which
  255. extends from November to May, during which weather condi-
  256. tions are generally good, the only difficulty being lowered
  257. runway visibility due to dust.
  258.  
  259.    The airport lies almost directly below the 28.5-degree
  260. flight path, hence its designation as an in-plane contin-
  261. gency site. The runway is 11,810 feet by 150 feet wide, with
  262. 200- and 400-foot overruns, and 25-foot paved shoulders.
  263. Three communications satellite circuits are used for com-
  264. munication, along with two commercial Gambian telephone cir-
  265. cuits.
  266.  
  267.  
  268. MORON AIR BASE, SPAIN
  269.  
  270.    The Moron Air Base has been designated a weather alter-
  271. nate TAL to the primary TAL, Ben Guerir, for low inclination
  272. launches. Moron was designated a TAL site in 1984. Moron can
  273. also serve as the secondary site for high inclination
  274. launches. It is located about 35 miles southeast of Sevilla
  275. and 75 miles northeast of Rota Naval Station. Although Moron
  276. is close to the foothills of the Sierra de Ronda mountain
  277. chain, most of the surrounding countryside is flat with a
  278. few hills and shallow valleys. Elevations vary from 200 to
  279. 400 feet above sea level. The weather is generally good with
  280. no associated unusual weather phenomena.
  281.  
  282.    The Moron AB has an 11,800- by 200-foot runway with
  283. 1,000-foot overruns and a 50-foot asphalt-stabilized
  284. shoulder. Communication at Moron includes a dedicated cir-
  285. cuit to KSC/Cape Canaveral Air Force Station via Goddard
  286. Space Flight Center and the NASCOM Madrid Switching Center,
  287. three circuits via satellite, and an 800-line automatic dial
  288. exchange.
  289.  
  290. ZARAGOZA AIR BASE, SPAIN
  291.  
  292.    Zaragoza AB was designated a TAL site in 1983. It is the
  293. primary TAL site for high inclination launches and like
  294. Moron is a Spanish base used by both the U.S. and Spain. Lo-
  295. cated northwest of the town of Zaragoza, it has two parallel
  296. runways, one 9,923 feet by 197 feet and the other 12,109
  297. feet by 197 feet. The longer runway has 1,000 feet of over-
  298. run and is used primarily by the U.S. Air Force. Its length
  299. and the prevailing winds make the longer runway the most
  300. suitable for Shuttle use.
  301.  
  302.    Communications at Zaragoza include one dedicated circuit
  303. to KSC/CCAFS via Goddard and the Madrid switch, three cir-
  304. cuits via satellite, and an automated dial exchange. An
  305. AUTOVON voice circuit is available.
  306.  
  307. SHUTTLE SUPPORT EQUIPMENT AT TAL SITES
  308.  
  309.    NASA has enhanced each of the four TAL sites with equip-
  310. ment to support an orbiter landing, including:
  311.  
  312.      --Navigation and Landing Aids: NASA has equipped each
  313. of the four sites with Shuttle-specific navigation and land-
  314. ing aids. The TACAN, or Tactical Air Navigation system,
  315. works in conjunction with the MSBLS system, or Microwave
  316. Scanning Beam Landing System. Together the two will provide
  317. the orbiter with all the necessary data to make a safe land-
  318. ing. The TACAN is positioned to provide distance and bearing
  319. information to the orbiter. The orbiter will be able to lock
  320. on to the TACAN while still several hundred miles out over
  321. the Atlantic and receive precise guidance information to ef-
  322. fect a successful alignment with the runway. The MSBLS sys-
  323. tem is accurate within five hundredths of a degree and
  324. provides the proper elevation landing angle from about
  325. 30,000 feet to touchdown.
  326.  
  327.    Lighted aim points include six strobe lights located at
  328. 6,500 feet from each runway and spaced about two feet apart
  329. on the runway centerline to a point 6,490 feet from each
  330. threshold. They assist the orbiter crew in locating the PAPI
  331. lights.
  332.  
  333.    PAPI, Precision Approach Path Indicator Lights, with as-
  334. sociated strobes, will be utilized by the orbiter crew to
  335. verify outer glide slope during a landing. Two sets are used
  336. to accommodate high and low wind scenarios. High wind PAPI
  337. lights are 6,500 feet on centerline prior to each threshold
  338. and low wind PAPI lights are 7,500 feet on centerline prior
  339. to each threshold.
  340.  
  341.    Ball/bar lights will be used by the Shuttle astronauts to
  342. verify proper inner glide slope during landing. The ball/bar
  343. lights are installed along both runways. The ball light is
  344. 1,700 feet from the runway threshold, the bar light 2,200
  345. feet.
  346.  
  347.    Distance-to-go markers will allow the crew to determine
  348. the distance remaining to the end of either runway during
  349. landing and rollout. These markers are installed on each
  350. side of the runway, 1,000 feet apart, starting from each
  351. threshold to the barrier.
  352.  
  353.    Xenon lights are a high intensity flood light system,
  354. complete with diesel generators, which will provide runway
  355. lighting in the event of a night TAL. The system is portable
  356. and consists of two sets of three lights. A set is installed
  357. on each side of the runway at the threshold, 150 feet from
  358. the centerline on a raised platform truck.
  359.  
  360.    The ball/bar and PAPI lights, lighted aim points,
  361. distance-to-go markers and Xenon lights are installed prior
  362. to each Shuttle launch and dismantled after it is completed
  363. and stored away.
  364.  
  365.      --Weather Equipment: Each TAL site has an automated
  366. weather station that transmits via the Geostationary Opera-
  367. tional Environment Satellite (GOES).  During a Shuttle
  368. launch, the Defense Department will provide weather observa-
  369. tions at two of the TAL sites, Moron and Zaragoza, Spain,
  370. while Morocco and The Gambia will handle this function
  371. within their own countries. Responsibility for weather
  372. forecasting will always rest with the NASA Shuttle Meteorol-
  373. ogy Group (SMG).
  374.  
  375.      --Shuttle Orbiter Arresting System: Three of the TAL
  376. sites, Yundum, Moron and Zaragoza, are equipped with the
  377. Shuttle orbiter arresting system (SOAS), which is a net bar-
  378. rier installed prior to and dismantled after a successful
  379. launch. The SOAS, a self-contained system which can be in-
  380. stalled in eight hours by a crew of eight, is installed
  381. about 800 feet from the end of the pavement to safely stop
  382. an orbiter vehicle if necessary. Ben Guerir with its longer
  383. runway does not require the SOAS.
  384.  
  385.      --Dedicated Orbiter Ground Support Equipment: Special
  386. orbiter ground support equipment has also been installed and
  387. is stored on-site between missions. These are a hatch open-
  388. ing tool, landing gear lock pins, grounding cable, tow bar,
  389. tow bar adapter and towing vehicle.
  390.  
  391.      --Fire, Crash and Rescue Resources: A team of NASA
  392. fire, crash and rescue personnel will be on-site during mis-
  393. sion support, supplemented by trained personnel from the
  394. country in question. Fire-fighting equipment is permanently
  395. stored at Ben Guerir; at Banjul, local fire equipment is
  396. used, and at the two Spanish bases U.S. Air Force equipment
  397. is available.
  398.  
  399.      --Aircraft Support: U.S. Defense Department C-130
  400. aircraft are positioned at Ben Guerir, the primary TAL site
  401. for low inclination launches, and at Banjul and Moron Air
  402. Base. For high inclination launches, a C-130 would be posi-
  403. tioned at Zaragoza Air Base. Each aircraft is staffed with
  404. medical personnel and is capable of transporting the entire
  405. Shuttle crew. The C-130s will also be used to transport TAL
  406. ground personnel between sites. Additional aircraft, person-
  407. nel and equipment will be flown over from the U.S. to bring
  408. the orbiter back. Pararescue personnel are available to as-
  409. sist with search and rescue operations and medical treatment
  410. in the event of a crew bailout from the orbiter.
  411.  
  412. WHEN A TAL OCCURS
  413.  
  414.    About a week prior to a Shuttle launch, a team of U.S.
  415. personnel will arrive and activate the TAL sites identified
  416. for that mission. This mission support team will include up
  417. to about 50 government personnel headed by the NASA ground
  418. operations manager. The Defense Department medical team will
  419. arrive on-site 24 hours prior to launch.
  420.  
  421.    If a TAL is declared, the TAL site will be notified by
  422. NASA that the Shuttle is going to land there. The U.S. State
  423. Department will notify the country involved and the air
  424. space will be cleared.
  425.  
  426.    The time from declaration of a TAL to a landing is es-
  427. timated at about 20-25 minutes. Once the Shuttle crew com-
  428. mander punches the TAL call into the pre-programmed orbiter
  429. computers, the vehicle will automatically be steered toward
  430. the  landing site. The orbiter will roll heads-up before
  431. main engine cutoff and all extra fuel will be dumped to in-
  432. crease vehicle performance by decreasing its weight,
  433. properly placing the center of gravity and lowering landing
  434. weight. The Shuttle will automatically fly to an altitude of
  435. about 360,000 feet and the remaining engines will cut off at
  436. the correct velocity. The external tank will be jettisoned
  437. after engine shutdown, as in a nominal launch, and then
  438. tumbled to insure that it does not glide into the Earth's
  439. atmosphere.
  440.  
  441.    A pre-loaded reentry program will then go into effect,
  442. with the orbiter encountering the atmosphere and a normal
  443. reentry planned. Ten minutes before landing, normal com-
  444. munications will resume through the Tracking and Data Relay
  445. Satellite (TDRS). The orbiter crew will contact the TAL site
  446. on UHF radio and begin their approach to the field in
  447. preparation for landing. Data received from the TAL TACAN is
  448. received and used to update the orbiter's inertial guidance
  449. system 200 miles from touchdown as the spacecraft slows to
  450. Mach 7.
  451.  
  452.    At landing minus 6 minutes, the orbiter will enter what
  453. is considered to be the terminal area. At this point its al-
  454. titude is still quite high, 82,000 feet, and its speed
  455. supersonic--Mach 2.5. Its flight is akin to a conventional
  456. aircraft's except that its speedbrakes will be left open to
  457. provide greater stability during supersonic flight.
  458.  
  459.    Approximately five minutes before touchdown, the orbiter
  460. will pass over the center of the runway with the speed drop-
  461. ping to Mach 1. About four minutes before landing, the crew
  462. commander will take over manual control of the spacecraft.
  463. This will be just prior to a maneuver known as intercepting
  464. the heading alignment circle. This is a large 270 degree
  465. turn to align the orbiter with the center line of the run-
  466. way.
  467.  
  468.    At landing minus 2 minutes, the orbiter will enter its
  469. final approach at an altitude of 13,000 feet. The
  470. speedbrakes are closed at an altitude of 3,000 feet. At an
  471. altitude of 1,800 feet and 7,500 feet from the end of the
  472. runway, the commander begins a preflare maneuver to pull up
  473. from a glide angle of 17 degrees to a more gentle slope of
  474. one and a half degrees. Touchdown speed is 195 knots.
  475.  
  476.    The Shuttle flight crew is expected to give its first
  477. report to Mission Control at T+50 minutes. Exit from the or-
  478. biter will occur at about one hour and ten minutes into the
  479. launch cycle. At about T+4 hours, the crew will depart the
  480. TAL site aboard the C-130 and will be taken, if uninjured,
  481. to an evacuation site--the nearest U.S. military base--or to
  482. appropriate medical facilities if injured. Some 16 hours
  483. into the launch, a KC-135 aircraft will arrive at the
  484. evacuation site and, depending on the crew sleep cycle, will
  485. take the crew back to the U.S. The flight crew will remain
  486. together unless medical circumstances dictate otherwise.
  487.  
  488.  
  489. Ground Operations
  490.  
  491.    Once the crew has left the orbiter, the crew hatch will
  492. be closed and special equipment installed to prepare the
  493. vehicle for transport. It will then be towed to a remote
  494. deservicing park site.
  495.  
  496.    Safing and deservicing of the orbiter will be initiated
  497. by the Rapid Response Team. The RRT includes up to 50
  498. workers and equipment, most of it coming from Edwards AFB,
  499. Calif., where the majority of Shuttle landings have taken
  500. place. Depending on the situation, the RRT should arrive at
  501. the TAL site within a day aboard a C-141 aircraft.
  502.  
  503.    Following the advance RRT contingent, additional person-
  504. nel and equipment will brought in to effect the orbiter tur-
  505. naround. NASA estimates it will take some 55 C-141 aircraft
  506. and 30 C-5A aircraft sorties and a total of about 450 per-
  507. sonnel to complete turnaround. The TAL site ground opera-
  508. tions manager will be in charge.
  509.  
  510.    A Mishap Investigation Team (MIT) will also travel im-
  511. mediately to the site to collect data on the unscheduled
  512. landing.
  513.  
  514.    Payloads and/or airborne support equipment will remain
  515. aboard the orbiter for the flight back to Kennedy Space Cen-
  516. ter unless the capability of the Shuttle Carrier Aircraft
  517. (SCA), landing site location or other requirements dictate
  518. otherwise.
  519.  
  520.